Low-Voltage Pre-Wiring
The cheapest time to wire a home is before the walls close. We rough-in every low-voltage cable you might want, even for systems you plan to add later, so nothing has to be surface-mounted or fished through finished walls.
What we rough-in
- Speaker and subwoofer locations with back boxes
- Camera and access point locations with mounting rings
- TV locations with power, HDMI and data
- Alarm sensor wire drops and control panel back boxes
- Smurf tube conduit for future cables
How we work
We work from your plans and walk the framed space with you, marking each location before cables go in. Every cable is labelled at both ends and photographed before insulation, so you have a record of where everything runs.
One quote, every line
Pick the services below and we will price equipment and labour together.
What's included
Pick the services you need
Tick the services you need and request one quote for all of them.
FAQs
Frequently asked questions
Something else on your mind? Ask us and we will answer before you book anything.
Ask a questionWhen should pre-wiring happen in a renovation?
After framing and rough electrical, before insulation and drywall. We coordinate with your contractor on timing.
Is it worth wiring for things I might add later?
Usually, yes. A cable or empty conduit costs far less now than opening finished walls later.
Do you work with my contractor or builder?
Yes. We schedule around the other trades and share the wiring plan with your contractor.
Guides
Read before you buy
Related services
Often installed together
Get a quote
Tell us what you need
Tell us about your home and what you want it to do, and we will get back to you with next steps.